久久久欧美日韩免费观看|国产又粗又硬又长又爽|无码不卡视频在线观看|欧美色一区二区三区四区|久草新视频在线观看12|亚洲国产精品人人做人人爱

很抱歉,您尚未登錄!
VIP會員登陸后可以查閱當(dāng)前板塊內(nèi)容,請登陸后查看!
請點擊登錄

  • TOP
  • 手機版
    全部提示消息

    易之家外貿(mào)SNS社區(qū) Tradesns foreign trade community
    當(dāng)前所在頁面位置: 首頁 > 貿(mào)易博文 > Thailand 20KW solar power system
    文章作者
    劉錦文
    關(guān) 注
    加 好 友
    站 內(nèi) 消 息
    作者文章精選
    查看更多>
    Thailand 20KW solar power system
    瀏覽量:238 | 回復(fù):0 | 發(fā)布時間:2018-09-17 15:01:27

    2018-08-08 TANFON engineer went to Thailand for installing TSP20KW solar power system, which system is used for our customer's factory electricity power supply.

    The Inverter and batteries are installed in the main switch of the three-phase government's electric input, which is convenient for connection and working.

    Use 2 pieces circuit breakers of three-phase high-power, and 4 pieces 1P 63A circuit breakers, and 16-square copper wire and battery connection terminals.

    The electrician requested by the customer is very dedicated, and the switching of the mains complementary system is easy to install.

    The system connection is a single power supply system, that is, the mains supply is not connected to the inverter bypass and charging work, directly with the load output line and the solar system output line as the switching point, the solar system works, there is no need for the mains work, when no sunshine ,will use city power working automatically

    The power of the local three-phase system, the project of the factory is directly used as the neutral line, so there is no separate neutral line, the bypass can be loaded.

    All loads at the customer's factory are of single-phase load and three phase load work together .

    The load detection power is 20A, 17A, 14A. For three-phase power, it means that the peak power will occasionally be overloaded. When the air conditioner works, the data from the inverter can be seen to be the highest single-phase point return overload. After the machine is working 5-- After 10 minutes, the alarm is overloaded to shutdown, and the operation is automatically restarted 2 minutes after shutdown.

    There was no overload after turning off an air conditioner.(so if three phase inverter take the single phase load ,Let load balance)

    The above is our TANFON installation working report of the Thailand 20KW solar power system.

    關(guān) 注 (0
    評 論(0)
    分 享
    熱門
    相關(guān)
    實戰(zhàn)案例:一個付款方式不妥協(xié)的客戶
    作者
    蔣江雷
    回復(fù):9 | 發(fā)布時間:2018-09-22 16:21:40
    分享5月最新買家尋盤(1000多條)5
    作者
    李名
    回復(fù):0 | 發(fā)布時間:2009-06-29 16:37:49
    遇到騙子了?
    作者
    liuyuting
    回復(fù):0 | 發(fā)布時間:2009-11-26 17:04:38
    2011年最新外貿(mào)詢盤信息分享35
    作者
    邢智強
    回復(fù):0 | 發(fā)布時間:2011-09-26 15:01:33
    2011年最新外貿(mào)詢盤信息分享25
    作者
    邢智強
    回復(fù):0 | 發(fā)布時間:2011-08-18 12:08:24
    有用的買家信息
    作者
    張一
    回復(fù):0 | 發(fā)布時間:2010-07-28 22:36:09
    (轉(zhuǎn)載一些)全球部分買家信息
    作者
    孫曉菲
    回復(fù):0 | 發(fā)布時間:2008-11-29 11:20:10